Hi Gurus,
There is any way to make mandatory for planning calendar in MRP view 2 in material master if I select lot size as PK( Period lot size acc. to plng calendar)
Thanks in advance
Abu Fathima
Hi Gurus,
There is any way to make mandatory for planning calendar in MRP view 2 in material master if I select lot size as PK( Period lot size acc. to plng calendar)
Thanks in advance
Abu Fathima