Hi,
I am trying to disptach splits in CM27 and it works fine. I have a work center with 4 individual capacities and I use the planning board "Split/allocate" function. However once I have distributed the opn qty and dispatched the splits, the operation iself remains in Released status and does not get the dispatched status assigned. Is that the way CM27 works or am I missing some config. Right now its an extra step where I first dispatch the entire opn, then split the qty and then dispatch the splits.
Thanks