1) Defining the Back-flush error correction settings in confirmation parameter.
2) Defining checking rule and scope of check - which is the heart of ATP setting. Defining the receipt and issue elements to be considered for ATP
3) Configuration of checking control - analyzing in detail all the trigger points for production order creation.