Hi masters,
I have a problem with Dynamic Daily Work Schedule Assignment.
When the TIP has only one entry, from time pair, Dynamic Daily Work Schedule Assignment works great.
When I put an entry from I2005 with extra hours, and this entry is the first pair in the TIP, Dynamic Daily Work Schedule Assignment doesn´t work correctly, because it processes the pair types, that are 1 booth (the pair of I2005 and the pair from time pair of the current employee).
Then, the system shows this note: Dyn. assignment of DWS not possible.
Any solution to solve this?
I know that if the I2005 entry is after the time pair, it works great, but i need a solution because the I2005 entry is processed in function offree "holes"havingtheir ownemployeepair time.
Thanks a lot!