Regarding Minimum amount in dunning

$
0
0

Hi Experts.

 

I have configured 1000 rs as a minimun amount for dunning level, but still after dunning run system is ignoring it.

let me know what other configuration required.

 

Regards

Atul


How to configure alternative sales document type?

$
0
0

Dear Expert,

 

Greetings I'm configuring alternative sales document type in VOV8.

It means for one sales document any other two sales document can be assigned as an alternative sales document.

So that users can switch over into any other alternative sales document with out exiting from present one.

 

Ex. OR - RO & CS

      RO-OR & CS

      CS-OR & RO

 

Please help me how to configure it and suggest suggest what are the prerequisites condition for it.

 

Thanks,

Soman 

Error in invoice: Message no. M8063

$
0
0

Hi

 

When I issue a PO and then GR in a simple way, there is no problem and I can issue invoice by MIRO. But when I assign an invoicing plan in invoive tab of PO and then save the PO and GR, while issuing invoice in MIRO I face this error:

 

"Document does not contain any items

    Message no. M8063

Diagnosis

    The document contains no posting lines with a value other than zero.

System Response

    The system will not save the document"

 

What should I do?

Future date Standard price update for Split valuated Materials

$
0
0

Hello experts,

 

We manage materials with different valuation type. For example:

 

Material 12345 has price control "V" and  2 splits with price control "S".

Each one of these splits have a different Valuation type.

 

Now, we need to update the Standard price for each one of these splits for a future date.

 

I've made some tests:

 

1. Tried to update the STD price by entering the "Future price" and "Future price from" in the Accounting 1 view followed by CKME t.code run,

but it only updates the standard price and not the "Per. unit price" .

 

2. Updated the STD price using t.code MR21 , the update seems to be right but I can't make the update with a future date because the future periods are closed.

 

What is the right way to handle that issue?

 

Thanks ahead,

 

Bilya

Future date Standard price update for Split valuated Materials

$
0
0

Hello experts,

 

We manage materials with different valuation type. For example:

 

Material 12345 has price control "V" and  2 splits with price control "S".

Each one of these splits have a different Valuation type.

 

Now, we need to update the Standard price for each one of these splits for a future date.

 

I've made some tests:

 

1. Tried to update the STD price by entering the "Future price" and "Future price from" in the Accounting 1 view followed by CKME t.code run,

but it only updates the standard price and not the "Per. unit price" .

 

2. Updated the STD price using t.code MR21 , the update seems to be right but I can't make the update with a future date because the future periods are closed.

 

What is the right way to handle that issue?

 

Thank you in advance,

 

Bilya

Budget amount in ME21N Header Level

$
0
0

Dear Gurus,

 

My requirement is enter the budget for the particular PO in the header and take report of Budget vs Actual ( Savings Report).

 

Where to enter the Numeric Value of Budget as mentioned in example.

 

My PM gives me budget of 2,00,000 , i need to enter enter against PO XX which is 1,85,000/- , i need to get a report budget vs po value.

 

Thanks in advance.

ABAP table that hold the statistical key figure description

$
0
0

Hi

What is the name of ABAP table that hold the statistical key figure description?

Service master short text on multiple languages

$
0
0

Dear colleagues,

Is it possible to maintain service master short text in different languages?

Regards,

Harry


Two Invoice generating against single OBD

$
0
0

Dear SAP-SD Friends,

     My client is facing a problem while generating Invoice, Two invoices are generating against single OBD by using two different Plant. How to Stop this Process.

 

Thanks and Regards,

Manjunath

Finsta idoc clearing with wrong interpretation algorithm

$
0
0

Hi All,

 

We have an issue in our production system, where in vendor checks from one of our house banks are not auto clearing.

 

process followed is:

periodically we receive the bank statements electronically in EDI

FINSTA-format. Before FINSTA we upload FIDCC2 to post accounting doc ZS

and then subsequently FINSTA uploaded to auto clear the ZS Doc.

 

The EDI file is converted to IDOC.

The IDOCs are uploaded to SAP.

Then the batch job will run transaction FEBP. This will post ZR doc with reference field xblrn having the check number.

 

external transaction 057 is configured - interpretation algo 21 - reference document. posting rules y11 & y12 for +,- postings. I can see in we02 that respective idoc (for which check is not auto clearing in FEBA) has field BUSZBE-057, but in FEBA it shows as 475.

 

I can also see the same in tables FEBKO & FEBEP. bank statement is interpreted & it shows ext transation 475

 

So basically during auto clearing ext transaction 475-interpretation algo 11 is triggered instead of 057.

 

We are using enhancement FEB00001 with exit RFEBBU10_001 wherein we have inserted coding to clear GL open items with clearing logic on the basis of search XBLNR for FEBEP_INTAG -as 21 interpretation algo

 

few more findings:

-in my test system i am able to trigger fresh finsta (post corresponding ZS doc manually using fb01-ref field filled) & execute FEBP, system clears it with 057.

-this issue is coming for a particular partner, but i can see any reason for same as ZS document (posted by idoc FIDCCP02 has a field for partner, finsta doesnt even have it & ZS document is successfully posted few days before only.

- i have checked my refrence field-XBLNR in both document ZS/ZR - it is of 10 digits alwayz hence no issue w.r.t to leading zeros.

 

Requesting for your help in finding a fix.

HR mini-master

$
0
0

Does anyone know what is HR mini-master and its integration. Which infotypes are involved in this!

 

Is CATS or payroll any way related!

 

Regards,

Bharat

Forward Contracts for Forex

$
0
0

My Client gets a forward contract to hedge against the imports. These contracts are for a specified time and amount. I am intending to use product type 60B or 60C for the same. I have the following question -

 

  1. Since the contract needs to be settled once the time or amount is reached. As i understand the time tracking will have to be done manually with the help of standard reports. However for the amount, the same linked to the PO and Invoice, PLEASE LET ME KNOW IF THIS LINKING IS POSSIBLE AND ALSO HOW CAN I TRACK THE BALANCE AVAILABLE IN THE CONTRACT AFTER EACH UTILIZATION, IS THERE A STANDARD WAY TO DO THIS.
  2. Which of the STANDARD product is recomended. Since in 60B i do not find any end date while 60C offers another additional TAB for HEdged where this expiration date can be entered.

Thanks

FM to read From SAP PS

$
0
0

Hi All,

 

Are there any FMs available to read below information from SAP PS...

 

1) Invoice Value for the Sales Order that is tied to the SAP PS WBS (The amount the customer has been invoiced)

2) Revenue Plan for SAP project/WBS  (CJ42)

3) As-sold (contract value of the project)

 

Basically business works on build-to-order solution...

 

Regards,

Hari

Scheduling - transit time & specific transit time

$
0
0

Hello!

 

We're using route schedules for shipping scheduling and have the following problem:

 

We have a route with a transit time of 5 days and a dependend route schedule with 1 day specific transit time. According the afore mentioned note 547961 the 5 days should not matter in scheduling. But when entering a sales order position using this route schedule, goods issue date is being forwarded (at least) 5 days to the future and then the 1 day specific transit time is being added.

 

Note 547961 states that when using route schedules with specific transit time, route transit time will not be used ("If you use a route schedule, the transit duration of the route schedule is used instead of the transit duration of the route. For detailed information on this, see Note 146829."). Note 146829 tells us to define a route transit time of at least the maximum specific transit time ("Since the transit time and the specific transit time depend on each other in terms of business management, you should enter a transit time that is the same as or greater than the specific transit time for the last point.").

 

With this system behaviour it is not possible to correctly determine delivery dates for route schedules scheduled within the next days, because route transit time always forwards it to the "far" future.

 

Is there anything we can do to prevent this kind of behaviour?

 

I hope you guys have a solution for us! Thank you in advance!

 

Henrik Suess

MR8M System gives me error Assign document type

$
0
0

hi

 

Currently I activate retention amount functionality.

I did the customization at SPRO- MM- LIV- Incoming invoice- Maintain Number Assignments for Accounting Documents, then maitain new doc. type &assign no. range for that for FI. Then come to third box, Doc. types in Invoice verification. click on MIRO, assign the doc. type which you created for retention money for FI.

Now you can post the doc. There will be 2 FI documents created one for normal transaction & another for retention money.

Now I have to reverse the MIRO in MR8M .System gives me error .Assign document type Please hep how to solve this issue.

 

Thanks in advance.

 

Message was edited by: Jürgen L


FTXP - multiple tax percentage rate

$
0
0

hi, what is the reason to have multiple tax percentage rates in FTXP for tax code? I have just revied configured tax codes and found 3 tax codes with VST (19%) and ESA (-19%) maintained both rates are assigned to GL accounts that are defines for INPUT TAX, thank you for help and info

TCode: KEPM Planning Frame Work.

$
0
0

Hi ALL,

 

our requirement is to add the new targets for the year 2013 in KEPM transaction. We have given new values to upload. but when we try to change the previous year values with new values system is not allowing to update the new values.

 

Planning levels are updated with reference to last years values, But in planning methods while entering planing new values in ENTER PLANNING DATA, system is not allowing to svae.

 

Can you please help me in understanding the process of uploading the new valuies for new fiscal year.

 

 

Regards,

Nandu

how to get scrap cost of 541mov mtrl in subcontracting

$
0
0

dear Gurus

 

subcontract process

 

1.i am sending mtrl A = 100 qty to vendor for chrome plating. (Mtrl cost is 2000 rs /qty , but Plating cost is 100 rs /qty )

2.i done GR for A = 80 Qty

3.then remaining 20 qty vendor did some damage he cant give it back with / with out plating,

 

so i need to get money from vendor for that qty,

 

what are the steps in sap

Company vs company code and consolidations

$
0
0

Hello all,

    I need to create a branch office to one of our existing company codes.   It will be in a different country and will be in different currency.  It will have employees, expense reports, fixed assets, financials.  Eventually it will have sales and purchases.  The catch is that it needs to roll/report financially in the "parent" company code.   

    Our current structure is that one company code is assigned to (the same) one company.    We have one chart of accounts.   We are on New GL in ECC6.0 (SP604).   We have one SAP production instance (no cross boxes).   We utilize BI and BPC for reporting.  We do not use special purpose ledger.  We do not utilize business areas.   We only have 3 profit centers in each company code (2 types of production and 1 that is "other"). 

     I have read in SCN and SAP what the difference between a company and a company code is.  I also know that I can assign company codes to a company.

    What I don't find is any detailed information.

 

1.  Will all the financials roll into the company?  If yes, how?  Do I need special reports, etc.

2.  Can I move a company code from it's existing company to the new company code?   What are the implications of doing this?

3.  Are there any unique requirements (such as special purpose ledger) required to make this work?

 

I'm sure I have many other questions that I don't even know to ask.   I think creating the company and then assigning the current office and also the new branch office will be what I need.

 

Does anyone have any further insight into doing this?  Or, a link to additional information/documentation would also be helpful.

 

Many thanks for any insight anyone can provide.

 

regards,

Cheryl

Config for PC00_M10_OTEM to trigger exitHR_OUT_GEN_EXIT_4

$
0
0

Hi Friends,

 

I want to modify master_idoc_data segment record....and i have exit HR_OUT_GEN_EXIT_4.

But it is not trrigering ....i checked the standtard code ...and found a below codititon...

 

o_mend ne space at line number 42 ...it is not satiffying and so the exit HR_OUT_GEN_EXIT_4 is not triggering.

is there any SPRO setting ?

 

screenshot.png

 

Please provide your suggestion so that i can able to trigger exit .

 

Thanks..

Priyank

Viewing all 2436 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>